Presentation 2009

ALOS Symposium Hawai, The ALOS PRISM/AVNIR-2 Quality Control at ADEN, a status after three years of operation

Presentation 2008

ALOS CVST 7, ADEN QC presentation

ALOS Symposium Rhodes, ADEN Product, quality status

ALOS Symposium Rhodes, PRISM MTF assessment

Presentation 2007

ESA/ALOS Optical instruments Data Verification Closing Review, June, 2007

The contribution of the ESA to the commissionning phase of the PRISM/AVNIR-2 instrument on board ALOS, July 2007

SPPA ADEN QC; Support to the Visual inspection task, August 2007

ALOS optical data verification

Comparison between ADEN and JAXA PRISM/AVNIR-2 1B2G products

PRISM Final Calibration Validation Report issue 1 revision 0: October 20 2007

AVNIR-2 Final Calibration Validation Report issue 1 revision 1: July 05 2007

PRISM Consolidated verification report issue 1 revision 0: December 20, 2006

AVNIR-2 Consolidated verification report issue 1 revision 0: November 23, 2006

PRISM/AVNIR-2, JAXA MMO Simulation - Acquisition dates of ESA test sites Target Period: May 16 to Nov. 15, 2006

ALOS Verification and implemetation plan document v1.3. V1.3 is released and has been delivered to ESA - thanks to all PIs for their contributions.

PRISM/AVNIR-2 products, basic description

Specification and technical documents

ALOS/AVNIR-2 Level 1 product Format description, Rev J, Octobe 2006, JAXA

ALOS/PRISM Level 1 product Format description, Rev J, October 2006, JAXA

ALOS/PRISM and AVNIR-2 Level 1 data processing algorithm, Rev J, Octobe 2006, JAXA

Add on

Enter geodetic latitude and longitude of your AOI, and get the ALOS RSP See ESA/EADN target zones with Google Earth Definition of the ALOS Testfields for ALOS Product Performance and CAL/VAL Activities Using EOLI, the shape files of the test field